The slope was then divided into five equal plots of (2m by 4m) each. Each plot for one geotextile with the last plot as the control. A gutter was then constructed beneath each plot to help collect the unretained soil from the plots. Time to learn some skills from the young intellectuals as we walk you through how geotextiles were gathered, designed, constructed and applied. The future looks promising and you can’t afford to miss it. Stay tuned...